When Welding Goes Wrong: Learning from Past Failures
Based on research by Keith Birkitt and Adam Bannister, Health and Safety Executive – Science Division, UK
Welded joints are essential to the integrity of structures and equipment operating across a wide range of industries. From pressure vessels and storage tanks to lifting equipment and offshore installations, weld quality can determine whether a component performs safely throughout its intended service life.
When welding fails, the consequences can extend far beyond the cost of repair. Structural collapse, loss of containment, serious injury and fatalities are among the outcomes associated with defective welds in safety-critical applications.
Research undertaken by the UK Health and Safety Executive (HSE) has examined the underlying causes of welding-related incidents, identifying recurring weaknesses in design, fabrication, supervision and inspection.
The findings demonstrate that welding failures rarely result from a single isolated error. Instead, they frequently involve a combination of technical deficiencies and shortcomings in the systems intended to prevent them.
Investigating the Causes of Welding Failures
HSE identified 47 incidents in which weld quality contributed to a failure or potentially hazardous situation.
The investigations covered the period from 2005 to 2021 and involved several high-hazard industrial sectors.
Of the 47 cases, 39 originated from HSE incident investigations, while eight additional examples were provided by external organisations.
The purpose of the study was to identify recurring causes of poor weld quality and establish lessons that could help prevent similar incidents.
The research examined the complete welding process, from the initial design of a joint through to fabrication, inspection and acceptance.
Seven principal categories of contributory causes were identified:
-
Design
-
Materials
-
Welding process
-
Quality
-
Training and knowledge
-
Supervision and acceptance
-
Inspection
Each category was divided into more specific factors, allowing investigators to identify the technical and organisational weaknesses associated with individual incidents.
This approach recognised that a weld failure may involve several contributory causes.
For example, a poorly designed joint may be difficult to manufacture, while inadequate supervision and insufficient inspection may allow the resulting defects to remain undetected.
The study therefore considered the entire chain of decisions and activities that contributed to each failure.
Which Industries Were Affected?
The incidents occurred across a range of industrial applications.
The four largest sectors were oil and gas, lifting and cranes, mobile structures, and chemical processing.
Together, these accounted for approximately 60% of the cases.
The study also included incidents involving pressure vessels, pipes, storage tanks, caissons and structural equipment.
Rail, shipping and nuclear applications were excluded because they fell outside the regulatory scope considered in the investigation.
Carbon steel was the most frequently encountered material, appearing in approximately 60% of cases.
Alloy steels and stainless steels each accounted for approximately 13%, with the remaining incidents involving nickel alloys and aluminium alloys.
The distribution reflects the widespread use of welded steel structures in high-hazard industrial equipment.
However, the presence of different material types also illustrates the need for welding procedures and personnel competence appropriate to the particular alloy being fabricated.
The Consequences of Weld Failure
The incidents examined by HSE produced a wide range of consequences.
These included structural collapse, loss of containment, equipment failure, production shutdowns, injuries and fatalities.
In some cases, defects were identified through surveillance or safety monitoring before an actual failure occurred.
The reported outcomes were nevertheless serious.
Complete structural collapse occurred in 49% of the cases.
Injuries resulted from 21% of the incidents, while 11% involved one or more fatalities.
Approximately 13% of the investigations concerned situations identified before a failure took place.
The principal failure mechanisms included fatigue and overload, leading to ductile or brittle fracture.
Together, fatigue and overload accounted for approximately 60% of the failures.
Overload was not always the result of unexpected service conditions.
In some incidents, welds had been undersized, while in others the design had failed to account correctly for the magnitude or direction of the applied loads.
These findings emphasise the relationship between structural design, weld geometry and fabrication quality.
A weld can only provide the required performance if its dimensions, properties and location are appropriate for the forces it must withstand.
The Most Common Causes
The analysis identified quality, design, and training and knowledge as the three highest-ranking primary cause categories.
At the level of individual contributory factors, the results revealed several recurring weaknesses.
| Contributory factor | Percentage of incidents |
|---|---|
| Crack-like or volumetric flaws in welds | 49% |
| Poor weld geometry or insufficient weld size | 45% |
| No or inadequate welder supervision | 26% |
| Insufficient inspection coverage | 26% |
| Joint not designed for ease of fabrication | 23% |
| Suboptimal joint fit-up | 21% |
| Incorrect application or understanding of welding parameters | 21% |
These percentages overlap because individual incidents frequently involved more than one cause.
A Pareto analysis found that the five highest-ranking sub-causes accounted for approximately half of all recorded failure occurrences.
Inadequate welder supervision and insufficient inspection coverage were particularly prominent, followed by joints that had not been designed with practical fabrication requirements in mind.
The findings highlight an important distinction between the presence of a welding defect and the wider circumstances that allow it to occur.
A lack-of-fusion defect, for example, may result from poor joint preparation or inappropriate welding parameters. However, its presence in a completed safety-critical component may also indicate weaknesses in supervision, inspection or acceptance procedures.
Understanding these relationships is essential to preventing recurrence.
Case Study 1: Failure of a Temporary Attachment Weld
One investigation involved a six-tonne, partially fabricated vessel, described as a kettle, manufactured from 2½% chromium–1% molybdenum steel.
The component had been attached to a rotating jig using fillet welds.
The jig allowed the vessel to be repositioned so that further welding could be carried out in suitable orientations.
During rotation, the attachment welds failed and the vessel collapsed.
The falling structure struck a welder, causing serious, life-changing injuries.
Joint Preparation and Consumable Selection
The investigation identified several deficiencies in the attachment welds.
The surfaces had not been adequately prepared before welding.
Remnants of previous welds and flame-cut surfaces remained in the attachment area.
There was no evidence that material had been ground back to sound metal beneath the heat-affected zones of previous welds.
Consequently, the joint preparation contained excessive root gaps, lack of fusion and voids.
The investigation also found that both chromium–molybdenum steel filler metal and carbon–manganese steel filler metals had been used.
The selection and application of welding consumables were therefore among the factors requiring consideration.
Hydrogen Cracking
The condition of the attachment surfaces created further problems.
There was no evidence of adequate cleaning to remove surface rust before welding.
Rust and other contamination can introduce hydrogen into the welding process.
Metallurgical examination identified untempered bainite and martensite in the heat-affected zone and weld metal.
These microstructures indicated that adequate preheating had not been applied.
The combination of high restraint, a susceptible microstructure and a source of hydrogen provided conditions associated with hydrogen cracking.
The welds were therefore compromised by several interacting factors.
Supervision and Inspection
The investigation also identified organisational shortcomings.
Although the injured person was an experienced welder, that experience did not extend to welding chromium–molybdenum steels.
The temporary attachment welds had not been inspected.
Supervision throughout the operation was inadequate.
The case illustrates why temporary welds must not automatically be regarded as less critical than permanent joints.
In this instance, the attachments supported a six-tonne component during movement.
Their failure could therefore have consequences comparable with those of a permanent load-bearing weld.
The principal lesson is that temporary attachment welds must be designed, executed and inspected according to the loads and risks they carry.
Their temporary nature does not reduce the need for appropriate welding procedures, competent personnel or quality control.
Case Study 2: Failure of a Mobile Elevating Work Platform
A second investigation concerned the failure of an aluminium alloy bracket supporting the basket of a mobile elevating work platform (MEWP).
The bracket was subjected to repeated loading during service.
Fatigue cracking developed in the welded connections, ultimately leading to failure.
One occupant suffered fatal injuries, while another sustained life-changing injuries.
The incident also resulted in a £3 million fine.
Weld Size and Fusion Defects
The investigation identified several deficiencies in the welded bracket.
The welds were undersized and contained lack-of-root-fusion and sidewall-fusion defects.
These imperfections reduced the effective load-carrying capacity of the connections.
They also provided potential locations for fatigue crack initiation.
Fatigue performance is particularly sensitive to local geometry and stress concentration.
Consequently, a weld that appears capable of carrying a static load may still be unsuitable for repeated loading if its geometry or internal quality is inadequate.
Design and Loading Conditions
The investigation found that no fatigue assessment had been carried out during the design stage.
This was a significant omission because the bracket was part of a structure exposed to repeated service loading.
The investigation also established that the basket had occasionally been overloaded by as much as 20%.
These overloads exacerbated the fatigue cracking.
However, the presence of overload did not remove the significance of the welding deficiencies.
The failure involved an interaction between design, weld quality and operating conditions.
Inadequate Dimensional Inspection
Another important finding was the absence of effective dimensional inspection to demonstrate that the completed welds conformed to the drawing.
This allowed undersized welds to remain in service.
The case demonstrates that inspection must address more than visible surface imperfections.
Weld dimensions are fundamental to the strength and fatigue performance of a connection.
Where a structure is subject to cyclic loading, the specified weld size and geometry must be appropriate to the design and verified during manufacture.
The central lesson is that fatigue-critical welded joints require suitable design assessment, adequate weld quality and inspection capable of confirming compliance with the required dimensions.
Case Study 3: Failure of LPG Pressure Vessels During Hydrotesting
A third investigation involved liquefied petroleum gas (LPG) storage vessels undergoing routine in-service hydrostatic testing.
Three vessels failed below the specified test pressure of 23.35 bar.
One vessel failed at less than half that pressure.
Fortunately, no injuries resulted.
Each vessel measured approximately 3 m in length and 1 m in diameter.
The vessels were manufactured from 8 mm thick carbon–manganese steel using tandem submerged arc welding.
The failures occurred at circumferential welds joining dished ends to the cylindrical shells.
The Joggle Weld Configuration
The vessels incorporated a joggle weld arrangement.
In this configuration, the end of the cylindrical shell was rolled to a smaller diameter to form an integral backing ring.
The dished end was then positioned over the backing arrangement to create a V- or U-shaped weld preparation.
Examination of the fractured joints revealed that the preparation did not provide an adequate root gap.
The edge of the shell plate also had a radius corresponding to the joggle geometry.
As a result, the submerged arc weld did not penetrate to the backing ring.
An unfused region remained beneath the deposited weld.
This significantly reduced the effective weld section.
Inspection Limitations
The production welds had received 100% visual inspection and 10% radiographic examination.
However, the radiography was concentrated at the intersections between longitudinal and circumferential seams, following the inspection arrangement specified for the work.
This meant that the areas containing the critical lack-of-penetration defects were not examined.
The investigation concluded that a different distribution of radiographic inspection coverage could have identified the problem.
This is an important distinction.
The issue was not simply the percentage of weld examined but the selection of inspection locations.
An inspection programme may satisfy a specified numerical coverage requirement while still failing to examine the areas most likely to contain significant defects.
Welding Procedure Deficiencies
The investigation also identified problems with the welding procedure specification (WPS).
The available information was incorrect or insufficient, and a WPS had not been in place when the welding was performed.
The selected joggle configuration was also unsuitable for the specified steel grade under the relevant provisions of PD 5500.
The lack of penetration resulted in insufficient effective weld size.
In addition, the tandem welding process did not provide grain refinement, contributing to a brittle heat-affected-zone microstructure.
The incident therefore involved several failures of control, including joint design, welding procedure documentation, weld quality and inspection strategy.
The principal lesson is that compliance with an inspection percentage does not necessarily demonstrate that the most critical weld regions have been examined.
Inspection coverage must be considered in relation to the joint configuration, potential defects and consequences of failure.
Lessons for Welding Design
The HSE findings demonstrate that preventing weld failures begins during the design stage.
The designer must consider whether the proposed joint can be fabricated reliably.
This includes access for welding, joint preparation, fit-up tolerances, welding sequence and the specified weld size.
A joint that is difficult to manufacture may increase the likelihood of incomplete penetration, lack of fusion or other imperfections.
The required weld geometry must also be suitable for the loading conditions.
Fatigue-critical connections require particular attention because local weld shape and stress concentrations can strongly influence service life.
The criticality of each welded connection should be identified and communicated to those responsible for fabrication and inspection.
This is especially important for temporary attachments, repair welds and modifications introduced during installation.
Such welds may be overlooked if they are not included within the original design and quality assurance arrangements.
The Importance of Welding Procedures
A welding procedure specification provides the instructions needed to produce a joint consistently.
It identifies relevant parameters and conditions, including welding process, consumables, preparation and thermal controls.
However, a WPS is only effective if it is technically suitable and followed during production.
The incidents examined by HSE included examples where procedures were incomplete, unavailable or not applied correctly.
These shortcomings can have serious consequences when welding materials susceptible to cracking or when joint geometry requires particular attention.
Chromium–molybdenum steels, for example, may require carefully controlled preheat and other precautions to manage hydrogen cracking risks.
Welding personnel must understand the materials and processes involved.
The presence of a qualified welder does not automatically establish competence for every alloy or application.
Appropriate training and supervision remain essential.
Welding Supervision as a Safety Measure
Inadequate supervision was identified in 26% of the incidents.
This was one of the most frequent individual contributory factors.
Effective supervision helps ensure that welding is carried out in accordance with approved procedures and specified quality requirements.
It also provides an opportunity to identify deviations before they become embedded in the completed structure.
Examples include incorrect joint preparation, inadequate cleaning, unsuitable consumables and failure to apply required preheat.
Supervision should extend throughout the fabrication process.
It should not be limited to a final review of completed welds.
Personnel must also be encouraged to report non-conformances and unexpected conditions.
Where a joint cannot be prepared or welded as specified, the deviation should be assessed before work proceeds.
This approach is particularly important in high-hazard applications, where a seemingly minor fabrication change may affect the structural performance of a component.
Developing an Effective Inspection Strategy
Insufficient inspection coverage was another leading factor, appearing in 26% of the cases.
The research highlighted the limitations of inspection programmes that focus on convenient or easily accessible locations.
Such areas may be among the least difficult to fabricate and therefore less likely to contain significant defects.
Inspection should instead consider where defects are most likely to occur and where their consequences would be most severe.
The selected method must also be capable of detecting the relevant flaw type.
For example, visual inspection can identify certain surface conditions and dimensional deficiencies, but it cannot reliably detect all internal imperfections.
Radiographic and ultrasonic techniques provide additional capabilities, although their effectiveness depends on the joint geometry, material and expected defect characteristics.
The inspection programme must therefore be technically appropriate.
It is also important that inspectors possess the required competence and are sufficiently independent of the fabrication process.
The original research emphasised that advanced inspection techniques should not distract attention from basic checks.
Simple dimensional and visual examinations remain essential parts of welding quality assurance.
Planning and Quality Assurance
The findings reinforce the need for effective communication between designers, welding engineers, fabricators and inspectors.
Information about weld criticality, loading conditions and acceptance requirements should be available before fabrication begins.
Temporary attachments and repair welds must be included within the quality system.
Safety-critical repairs should receive appropriate supervision and inspection, with the same level of attention as the original fabrication.
Modifications made during installation should also be assessed for their effects on structural integrity.
These requirements help prevent situations in which an otherwise well-controlled manufacturing process is undermined by an unplanned or inadequately documented welding operation.
The aim is to establish consistent control throughout the complete welding lifecycle.
Why Multiple Failures of Control Matter
A notable finding of the HSE research was the frequent presence of several contributory causes within a single incident.
The temporary attachment failure involved poor surface preparation, unsuitable welding conditions, hydrogen cracking susceptibility, inadequate supervision and the absence of inspection.
The MEWP failure involved weld size and fusion defects, inadequate fatigue assessment, insufficient dimensional inspection and service overload.
The LPG vessel failures involved unsuitable joint preparation, incomplete welding procedure documentation, lack of penetration and inspection coverage that did not reveal the critical defects.
In each case, several opportunities existed to prevent the failure.
This demonstrates why welding quality cannot be assured through one control measure alone.
A qualified procedure, competent welder or inspection programme may reduce risk, but the effectiveness of the overall system depends on these measures working together.
Priorities for Industry
The HSE investigation identified several areas in which improvements could reduce the likelihood of welding-related incidents.
The first is better consideration of fabrication requirements during joint design.
The second is stronger supervision and control of welding operations.
The third is more effective inspection, including appropriate coverage of safety-critical welds.
These priorities are closely connected.
Good design makes reliable fabrication more achievable.
Competent supervision helps ensure that the specified procedure is followed.
Effective inspection provides evidence that the completed joint meets the required quality standards.
The importance of personnel knowledge extends across all three activities.
Designers, welding engineers, welders and inspectors must understand the function of the welded joint and the potential consequences of failure.
This understanding is especially important when dealing with temporary attachments, fatigue-critical structures, pressure equipment and repairs.
Conclusion
The HSE investigation into 47 welding-related incidents provides important evidence of the consequences of weaknesses in welding quality management.
Almost half of the incidents involved structural collapse, while a significant proportion resulted in injuries or fatalities.
The most frequent contributory factors included weld imperfections, insufficient weld size, inadequate supervision and ineffective inspection coverage.
The case studies demonstrate that these failures were not simply the result of poor workmanship.
They arose from combinations of design deficiencies, inappropriate welding conditions, inadequate communication and failures in quality assurance.
The central message is that welding integrity must be managed throughout the complete fabrication process.
Joints should be designed for reliable manufacture, welding should be performed using appropriate procedures and competent personnel, and inspection should focus on the locations and defects most relevant to structural safety.
Temporary welds, repair welds and installation modifications must receive the same consideration as permanent safety-critical connections.
By applying these lessons, industry can reduce the likelihood of avoidable welding failures and improve the safety and reliability of welded structures and equipment.
Reference
Birkitt, K and Bannister, A, When Welding Goes Wrong: Learning from Past Failures, Welding and Joining Matters, Issue 11, April 2025, pp 44–47.
Health and Safety Executive, Research Report RR1215. Available at: https://www.hse.gov.uk/Research/rrhtm/rr1215.htm
Original publication: Welding and Joining Matters, Issue 11, April 2025, pages 44–47.
Original authors: Keith Birkitt and Adam Bannister, HSE Science Division, UK.
Editorial note: This is a newly written website adaptation based on the published HSE research feature. The incident findings, statistics and case studies reflect the original report. This adaptation should be reviewed and approved before publication under the original authors' byline.